In shortTerminals reduce equipment downtime by finding the failures that repeat and removing their causes. Start with downtime data, define what counts as a repeat, set triggers for a root cause analysis, track every action to closure, and measure before and after.

Start with the data

Split downtime into planned and unplanned, then group unplanned downtime by equipment type, system and cause. A simple Pareto chart usually shows that a few failure types cause most of the lost hours.

Define a repeat failure

Agree what counts as a repeat: for example the same failure on the same equipment, or the same cause across the fleet, within a chosen period. Write it down so that everyone applies it the same way.

Set triggers for RCA

Close the loop

An RCA only pays off when its actions are done. Give each action an owner and a target date, update the PM plan or procedure where the cause was a gap, and check later that the failure has not returned.

Measure the result

Compare the period before and after a change. Claim savings only where your own data shows them.

Share what you learn

Keep a simple record of past RCAs so other shifts, teams and terminals can find similar cases and reuse the actions that worked.

Frequently asked questions

How much downtime can RCA remove?

It depends on how many repeat failures you have and how well the actions are carried out. There is no fixed figure, so measure your own downtime before and after.

What is a good trigger for a root cause analysis?

Start with repeat failures, long downtime, safety potential and high cost. Review the triggers after a few months and adjust them to your workload.

Run your own root cause analysis.
Describe the failure or add a photo or file, and RapidRCA builds the 5 Whys, fishbone, actions and report, using the ROOTS method.
Start an RCA

Last updated 14 October 2026. These guides explain a method and give examples. Always follow your equipment manufacturer's manual, your site procedures and applicable regulations.